Nailing is used to stabilize the soil in areas likely to be slipping. In the nailing method, along with soil digging, the insertion of steel reinforcing bars prevented the movement and slipping of the soil.
The proposed method for the implementation of nailing to stabilize sink walls usually consists of five main stages of excavation, boreholes drilling, fitting of reinforcing rebar, injection of cement slurries, concrete pouring and installation of plate and beads.
One of the most important problems in the field of civil engineering, construction of structures, protection of excavation and buildings in its vicinity. If the methods are not followed to protect the dams, the slopes under construction will result in irreparable damage.